1.Not About Making You Settle
The process starts with your environment, not our catalog. Tell us what disinfectant your department uses, how often the screen is cleaned, whether it moves on a cart or stays on a wall, and whether it needs to connect to your hospital's internal systems. We configure the unit around the answers — not the other way around.
2.Coating Matched to Your Disinfection Protocol
You provide the cleaning protocol. We match the antimicrobial coating to it. Disinfectant type, application frequency, which areas face more exposure — the coating is configured to the routine, not selected from a standard list.
3. Fanless Cooling. Designed for Clinical Environments.
Standard panels use fans to dissipate heat. A clinical room cannot — fans pull in dust, trap bacteria, and generate noise that disturbs patients. Our medical units use passive cooling architecture with no moving parts. Silent. Sealed. Built for spaces where air circulation cannot come at the expense of hygiene.
4. Interfaces Confirmed Before Production
Your hospital's HIS requirements are confirmed during the planning phase — before a single unit enters production. No retrofitting. No adapting your workflow to our system. Every interface is specified, verified, and documented in advance.
5. 72-Hour Continuous Operation Test. Every Unit.
Before shipping, every unit undergoes a full 72-hour continuous operation test. Not a sample. Not a one-hour pass. Run to completion under conditions that replicate a nursing station — a screen that never powers down. Units that fail are held back. Units that ship are units that have proven they can run without interruption.
6.Verified in the Lab Before It Reaches Your Facility
Coating durability is not taken from a specification sheet. It is tested — accelerated UV aging, salt spray exposure, vibration cycling, transport shock simulation. Conditions that replicate weeks at sea and years of daily disinfection are applied at the packaging stage. What arrives at your dock has already survived the worst part of the journey.
7.Rechecked Before Every Shipment
Before any order leaves the factory, every certification document is reviewed. Date still current. Model number matches. Certificate ID still verifiable on the issuing body's website. Not filed once and forgotten. Reconfirmed for every shipment. These three checks are what customs verifies at the port — and they are complete before the container is sealed.